Work to begin on Highway 12 through Fort Atkinson

The Wisconsin Department of Transportation (DOT) has announced that it will begin working on a 1.75-mile stretch of roadway on U.S. Highway 12, between the intersections of Highway 12 and County Trunk M and Highway 12 and Madison Avenue in Fort Atkinson. 

Work is scheduled to begin Monday according to information recently released by both the city of Fort Atkinson and the DOT. 

According to information on the DOT’s website, the work area will begin just south of the intersection of Highway 12 and County Trunk M and will include resurfacing and replacing the top 3-1/2 inches of asphalt pavement, along with upgrades to curbs and ramps to meet ADA standards at intersections, and installation of pavement marking within the work zone area. 

According to information released by city officials, some 92 sidewalk ramps, including curb and gutter upgrades at the ramps, will be replaced. 

City officials also have noted that the road will remain open during construction with flagging operations in place. 

A November completion date for the project is anticipated, according to  information released by city officials. 

A map, as supplied on the Wisconsin Department of Transportation’s website, shows a portion of U.S. Highway 12 roadway, marked in orange, that will undergo resurfacing and sidewalk ramp replacement, beginning Monday. The road will remain open to traffic during the project with flagmen in place, according to information released by Fort Atkinson city officials. Project completion is anticipated in November. 

This post has already been read 7535 times!

3 Comments

  1. Linda L Giorno

    This article says the road will be open during construction, but the Article on the Whitewater Banner is saying it will be closed. Which is true?

    1. editor

      A news release Fort Atkinson Online has received from Fort Atkinson City Engineer Andy Selle states that the road will be open during construction with flagmen present.

  2. Marilyn Hellenbrand

    Is highway 12 open from whitewater to Elkhorn for driving in both directions

Leave a Reply

Your email address will not be published. Required fields are marked *